Cement concrete engineering surface treatment ways and requirements


Release time:2019/8/8 11:39:18 Source:www.zhiyouhd.cn/

Abstract:The floating slurry of cement concrete bridge deck is induced by bridge deck waterproof layer failure, interlayer combination of damage and the main factors of bridge deck pavement damage. Therefore, if you don't hew bridge deck laitance thoroughly

Cement concrete engineering way of surface treatment and relevant demands and engineering characteristics, so according to the requirements of engineering, the equipment and construction technology are also different. Bridge deck chisel deck chisel MAO MAO's main purpose is to solve the problem of interlayer bonding. The floating slurry of cement concrete bridge deck is induced by bridge deck waterproof layer failure, interlayer combination of damage and the main factors of bridge deck pavement damage. Hew as a result, if not completely bridge deck laitance, bleeding in vibration under the action of traffic load, the interlaminar stripping due to shear capacity, and under the erosion of water burst, lead to the upper layer asphalt concrete destruction.

 
1. Cut wool not only to remove the deck laitance should also form a concave and convex pits, namely after be gouge on the surface of the difference between the peaks and troughs mill (mil) values should be larger, only in this way, the interlayer can cohere the firm. Cut hair highway semi-rigid pavement base before paving asphalt concrete semi-rigid pavement base depth of cut hair and requirements as well as equipment and deck used chisel MAO different requirements.
 
2. The purpose of these two kinds of surface treatment are made to bond between layers of asphalt concrete pavement and base surface and firm, and to prevent water seepage, the former is to hew out of the old cement concrete pavement of polishing rough surface, the latter is to remove the airport runway tires. Both of the objective is to rectify recovery against sliding and the ability to effectively improve the vibration deformation.
 
3. The chisel of cement pavement and airport runway cement pavement and airport runway chisel MAO MAO requirement is to prevent the vehicle and airplane landing skid.
 

Please indicate the source of the reprint:http://www.zhiyouhd.cn//en/news/3658.html。

Contact us

Get in touch with us. Please use the following contact at will.

Enter Your name
Please enter your mailbox account
Fill out your message here
Send success
I'm sorry, your sending is wrong.

Address:Shangdang town of Dantu District,Zhenjiang City,Jiangsu Province,China Telephone:+86 13852907688  fuhao@zjslxd.com www.zhiyouhd.cn/
巴中市| 荣昌县| 舟山市| 巩留县| 积石山| 漳平市| 黄大仙区| 沂源县| 通山县| 微山县| 门头沟区| 和平区| 永登县| 河源市| 和田县| 鸡东县| 桐城市| 宁夏| 博白县| 莎车县| 丰宁| 淮安市| 胶州市| 泸定县| 清水河县| 怀安县| 塔城市| 横峰县| 衡阳县| 衡山县| 凉城县| 新郑市| 穆棱市| 蒙自县| 神农架林区| 南汇区| 崇州市| 蒲城县| 阳泉市| 胶州市| 雷山县|